Blogs & Articles

Sort By
Power Generation | 25 September

Compare power generation systems on heat rate, capacity factor and cost. CCGT hits 7,146 Btu/kWh vs 10,000 simple cycle....

Read More
EPCM Services | 18 September

The 2026 ISO 19650 revision removes the handover data drop. What an owner must specify before award to receive a usable...

Read More
I and C Services | 11 September

NETA ATS sets 100 megohms minimum at 600 V and flags bolted connections deviating over 50 percent. The full electrical c...

Read More
Distributed Energy Services | 04 September

Mobile gas turbines commission in as few as 11 days against 18 to 24 month new unit lead times. ISO 8528 ratings, NFPA 1...

Read More
EPCM Services | 27 August

EPC solutions and services with guaranteed price and delivery cover 7 phases from FEED to handover. Prismecs delivers BI...

Read More
EPCM Services | 01 August

A Class 3 estimate carries minus 20 to plus 30 percent accuracy. A Class 5 runs minus 50 to plus 100. What the owner's t...

Read More
O&M Services | 24 July

O&M is two functions with one name. What an operations scope contains, how operators are qualified, ISA-18.2 alarm limit...

Read More
O&M Services | 17 July

Readiness is not commissioning. See how O&M integrates into design, what a handover must deliver, SAE JA1011 RCM criteri...

Read More
Power Generation | 11 July

NFPA 110 requires monthly 30-minute tests at 30% load, plus annual load banking. See wet stacking, the stepped protocol,...

Read More
Renewables | 03 July

The 2,600 GW U.S. interconnection queue and the OBBBA's July 2026 tax credit deadline are reshaping industrial renewable...

Read More
Power Generation | 19 June

Nine technologies compared on capacity, efficiency, heat rate, start time and cost per kW. Engines win below 50 MW, turb...

Read More
Renewables | 13 June

Cut generator emissions without losing uptime: renewable diesel drop-in, dual-fuel and gas gensets, hybrid storage, and...

Read More
Data Centers | 28 May

A defect found at factory test costs a fraction of the same defect at integrated systems test. The five levels, the load...

Read More
Oil and Gas | 22 May

Consulting engagements have names, standards and deliverables. RAM, RBI, RCM, HAZOP and condition assessment compared, p...

Read More
Renewables | 07 May

Your O&M contractor delivers availability. Your asset manager proves it against the guarantee and claims when it falls s...

Read More
Metals & Mining | 30 April

93 percent of mining sector emissions are Scope 1, generated on site. Diesel vehicles account for 30 to 80 percent of di...

Read More
Power Generation | 24 April

A turbine rated 115 MW at ISO may deliver 85 MW at your site. Temperature, altitude and inlet losses stack, and a guaran...

Read More