7 MW / 28 MWh Battery Energy Storage System in New York, USA
Storage sized to capture PV clipping losses and increase usable energy from an existing solar plant.
New York, USA
7 MW / 28 MWh Battery Energy Storage System
Prismecs delivered a 28 MWh BESS with a 7 MW interface to harvest overload loss from the site's PV array. We built a PVsyst model to quantify clipping, sized the battery accordingly, and guided design review and vendor selection through to startup and commissioning.
Services Provided
We transformed clipped PV into dispatchable energy through data-driven design and disciplined execution.
- PVsyst modeling to quantify the overload loss
- Storage sizing matched to the site generation profile
- Design review and vendor selection support
- Engineering, procurement, and construction support
- Startup and commissioning of the integrated system
Talk to our Project Expert
Need to add storage, improve yield, or de-risk integration? Prismecs delivers disciplined execution for power and BESS projects.
- Custom service package for your site
- Turbine and balance of plant parts support
- Quick and reliable mobilization