113.6 MW DC / 80 MW AC BESS Retrofit
Prismecs supported a large-scale solar and storage retrofit by pairing a 113.6 MW DC system with an 80 MW AC PV facility. Our team delivered the modeling, protection studies, design reviews, and field testing needed to bring the upgraded plant online safely and on schedule.
Services Provided
We transformed a complex PV retrofit into a grid-ready solar and storage asset through data-driven engineering and disciplined execution.
- PVsyst modeling for array sizing
- PSS/E and PSCAD models for utility impact at the point of interconnection
- Design review of EPC plant engineering
- DC and AC arc flash studies and reports
- Plant testing procedures and on-site interconnection testing
- Engineering, procurement, and construction support
- Startup and commissioning support
Talk to our Project Expert
Need to add storage, improve yield, or de-risk interconnection? Prismecs delivers disciplined execution for power and BESS projects.
- Custom service package for your site
- Equipment and balance of plant support
- Quick and reliable mobilization