We deliver engineering solutions, which maximize performance across energy-critical industries.
| Name | Technology | ,Hours Usage | Power | Specifications | Action | |
|---|---|---|---|---|---|---|
|
Baker Hughes M170 |
Aero-derivative Gas Turbine | New | 247.5 MW |
Output: 16.5 MW per unit Total Output: 247.5 MW Fuel type: NG / Liquid Diesel Turbine Ramp Rate: Fast-ramping aero unit Reliability: 99% Efficiency: 36.4% @ISO Service Intervals: 8000 hrs, 35k hrs , |
||
|
Baker Hughes NovaLT16 |
Aero-derivative Gas Turbine | New | 544.5 MW |
Output: 16.5 MW per unit Total Output: 544.5 MW Fuel type: Natural Gas Turbine Ramp Rate: Fast-ramping aero unit Reliability: 99% Efficiency: 36.4% @ISO Service Intervals: 8000 hrs, 35k hrs , |
||
|
(MHI) FT8 MOBILEPAC |
Aero-derivative Gas Turbine | Used | 278.1 MW |
Output: 30.9 MW per unit Total Output: 278.1 MW Fuel type: Natural Gas Turbine Ramp Rate: Fast Reliability: 95% Efficiency: High Efficiency Service Intervals: Included in lease service program |
||
|
(MHI) FT8 MOBILEPAC |
Aero-derivative Gas Turbine | Used (2010–23000 HR) | 162 MW @ 60 Hz / 144 MW @ 50 Hz |
Output: 27 MW @ 60 Hz, 24 MW @ 50 Hz Total Output: 162 MW @ 60 Hz, 144 MW @ 50 Hz Fuel type: Dual-fuel Turbine Ramp Rate: Fast Reliability: 95% Efficiency: High Efficiency Service Intervals: TBD |
||
|
GE LM2500 Core Engine |
Aero-derivative Gas Turbine | Refurbished | 372 MW |
Output: 22-35.6 MW per unit Total Output: 372 MW Fuel type: Natural Gas Turbine Ramp Rate: TBD Reliability: TBD Efficiency: High Efficiency Service Intervals: 4000 hrs, 25k hrs, 50k hrs , |
||
|
GE LM2500+G5 |
Aero-derivative Gas Turbine | New | 444 MW |
Output: 37 MW per unit Total Output: 444 MW Fuel type: Natural Gas Turbine Ramp Rate: 30 MW/min Reliability: 99% Efficiency: 38.5% @ ISO Service Intervals: 4000 hrs, 25k hrs, 50k hrs , |
||
|
GE LM6000 |
Aero-derivative Gas Turbine | OEM Refurbished & Used (2000 HR) | 192 MW |
Output: 48 MW per unit Total Output: 192 MW Fuel type: Natural Gas Turbine Ramp Rate: 30 MW/min Reliability: 99% Efficiency: 39.7% @ ISO Service Intervals: 4000 hrs, 25k hrs, 50k hrs , |
||
|
WGPW FT4C-1D Twin Pac |
Aero-derivative Gas Turbine | Refurbished | 50 MW |
Output: 50 MW Fuel type: Dual-fuel capable Turbine Ramp Rate: Fast Reliability: TBD Efficiency: TBD Service Intervals: TBD |
||
|
Siemens SST-5000 (2 x1 C C P) |
Siemens Heavy-Duty Turbine | New | 600 MW |
Output: TBD Total Output: 600 MW Fuel type: Steam Turbine Ramp Rate: TBD Reliability: 99% Efficiency: 57% @ ISO Service Intervals: 24–36k hrs, 8–10k hrs, 80–100k hrs , |
||
|
Siemens SGT6-5000F (SC) |
Siemens Heavy-Duty Turbine | Installed (Zero Hours) | 400 MW |
Output: 200 MW per unit Total Output: 400 MW Fuel type: Natural Gas Turbine Ramp Rate: 40 MW/min Reliability: 99% Efficiency: 39% @ ISO Service Intervals: 25–30k hrs, 40–50k hrs, 15–20k hrs , |
||
|
GE 6B.02 |
GE Heavy-Duty Turbine | Refurbished | 470 MW |
Output: 10 units: ~40+ MW, 2 units: ~35 MW Total Output: 470 MW Fuel type: Natural Gas Turbine Ramp Rate: TBD Reliability: High Efficiency: High Efficiency @ ISO |
||
|
GE 7FA.02 (SC) |
GE Heavy-Duty Turbine | Used | 600 MW |
Output: 150 MW per unit Total Output: 600 MW Fuel type: Natural Gas Turbine Ramp Rate: TBD Reliability: High Efficiency: High Efficiency @ ISO Service Intervals: 25-32k EOH, 24-32k EOH, 64k-50 EOH , |
||
|
GE 7FA.03 (SC) |
GE Heavy-Duty Turbine | Used | 320 MW |
Output: 160 MW per unit Total Output: 320 MW Fuel type: Natural Gas Turbine Ramp Rate: 30 MW/min Reliability: High Efficiency: 33.8% @ ISO Service Intervals: 25-32k EOH, 24-32k EOH, 64k-50 EOH , |
||
|
GE 7FA.05 (2 x1 C C P L A N T) |
GE Heavy-Duty Turbine | New | 1386.2 MW |
Output: TBD Total Output: 1386.2 MW Fuel type: Steam Turbine Ramp Rate: 80 MW/min Reliability: TBD Efficiency: 60.5% @ ISO Service Intervals: 25k EOH , |
||
|
GE 7FA.05 (SC) |
GE Heavy-Duty Turbine | New | 956 MW |
Output: 239 MW per unit Total Output: 956 MW Fuel type: Natural Gas Turbine Ramp Rate: 40 MW/min Reliability: 97.9% Efficiency: 39% @ ISO Service Intervals: 25k EOH, 24k EOH, 48k-50 EOH , |
||
|
GE 7HA.03 (1 x1 C C P) |
GE Heavy-Duty Turbine | New | 1282 MW |
Output: TBD Total Output: 1282 MW Fuel type: Steam Turbine Ramp Rate: 150 MW/min Reliability: TBD Efficiency: 64% @ ISO Service Intervals: 25k EOH , |
||
|
GE 7HA.03 (SC) |
GE Heavy-Duty Turbine | New | 860 MW |
Output: 430 MW per unit Total Output: 860 MW Fuel type: Natural Gas Turbine Ramp Rate: 75 MW/min Reliability: 98.5% Efficiency: 43.3% @ ISO Service Intervals: 32k EOH, 32k EOH, 64k EOH , |
||
|
GE LM2500+ Core Unit |
LM2500+ Gas Turbine | Low operating hrs | 32 MW |
Output: 32 MW Fuel type: dual fuel Heat rate: 8746, 8850, Btu/kW-hr, LHV , |
||
|
NovaLT16 Single gas GTG |
LT16 natural gas turbine | New | 66 MW |
Power Output: ~16.2 MW (simple cycle), ~16.8 MW, ~16.5 MW (site- and load-dependent) , Efficiency: ~36.1%, ~37.3% , CHP Efficiency: Up to ~80% Operational Availability: ≥99% |
||
|
NovaLT16 Single gas GTG |
LT16 natural gas turbine | New | 49.5 MW |
Power Output: ~16.2 MW (simple cycle), ~16.8 MW, ~16.5 MW (site- and load-dependent) , Efficiency: ~36.1%, ~37.3% , CHP Efficiency: Up to ~80% Operational Availability: ≥99% |
Items selected by you: 0
Items selected by you: 0 Items
| Name | Quantity | ||
|---|---|---|---|
| Description | KW |
Preparing your PDF...